Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Oral presentation

J-PARC; The Path to 1 MW at J-PARC, including 400 MeV linac improvement, RCS improvements, and front-end upgrades

Yamamoto, Kazami

no journal, , 

An accelerator system of Japan Proton Accelerator Research Complex (J-PARC) operated since May 2008 for neutron experiments. The accelerator system consists Linac, Rapid Cycling synchrotron (RCS) and Main Ring. The original design of RCS injection energy is 400 MeV, but first operation was started by 181 MeV for budget reason. New acceleration cavities were installed in J-PARC linac summer shutdown of 2013, and user operation to Material and Life science Facility (MLF) with 400 MeV injection energy was started from February 2014. Owing to the beam commissioning with 400 MeV injection energy, the amount of the beam loss was enough small and we established 300 kW continuous operation. In this paper, we report the present status and future plan of J-PARC linac and RCS.

1 (Records 1-1 displayed on this page)
  • 1